Steel structure export engineering

Johnny Joe, Senior Export Engineer at Hebei Hongji Shunda Steel Structure Engineering Co., Ltd.

Johnny Joe

Senior Export Engineer

Hebei Hongji Shunda Steel Structure Engineering Co., Ltd.

河北宏基舜达钢结构工程股份有限公司

Pre-engineered steel buildings for Africa and South America. One engineer, one contact, from drawing to shipment.

  • Since 2000
  • 107,000 m² manufacturing base
  • 6 production workshops
  • ISO 9001

01 / Positioning

A building that works on your site, not a pile of steel

I am the Senior Export Engineer at Hebei Hongji Shunda Steel Structure Engineering Co., Ltd., a Chinese manufacturer of prefabricated steel buildings. I spend my working life on one problem: getting a steel building built correctly, several thousand kilometres away from where it was designed.

Most of the people I work with are not steel specialists. They are food processors, logistics operators, cooperatives, mining companies and contractors who need a building, a schedule and someone who answers the phone.

02 / About

Hello — I'm Johnny Joe

Johnny Joe, Senior Export Engineer at Hebei Hongji Shunda Steel Structure Engineering Co., Ltd.

I look after the Africa and South America markets. Practically, that means reading a production requirement, having it engineered properly, and following it all the way to the container that arrives on site.

Where I come from

Hongji Shunda has been making steel buildings since 2000. Today we work from a 107,000 m² manufacturing base with six production workshops. Most of what goes wrong in an exported steel building is not the steel — it is a detail that was never resolved on paper before the container was loaded.

What I actually do

Buyers describe a business, not a structure. A food processor in Brazil needs a plant; a cooperative in Chile needs grain storage; a logistics operator in Mozambique needs a freight warehouse. My job is to turn that sentence into a building: span and column spacing, eave height, roof and wall system, crane and mezzanine provision, insulation strategy, and the corrosion protection that suits the local environment. Wind loading is calculated for the location of the project — never assumed, and never a figure picked because it sounds safe.

How I work

Our detailing is done in Tekla, so the drawings are clash-free before fabrication starts. Every part is marked and packed in a planned sequence, and first-time builders receive a 3D installation guide. I stay with the project through fabrication and shipment, and I would rather answer a difficult question early than explain a problem late.

Why buyers keep talking to me

I answer directly. If a design will not survive the local climate, I say so. If something is outside what we do well, I say that too. Clients in Africa and South America keep coming back for the same reason: what they were promised on the drawing is what stands on site.

03 / Capabilities

What the factory and the drawing office can do

Design in Tekla, prefabricate in the factory, ship as a numbered kit. These are the six things I specify on almost every project.

Est. 2000Operating since
107,000 m²Manufacturing base
6Production workshops
TeklaClash-free detailing
  • Pre-engineered steel buildings

    Warehouses, factory and workshop buildings, cold stores, logistics buildings, processing halls and industrial storage — specified as one coordinated package.

  • Structural parameters

    Span, column spacing, eave height, crane provision and mezzanine planning developed against what the building has to do.

  • Roof and wall cladding

    Roof and wall systems and insulation strategies selected for the project climate, from tropical humidity to dry inland heat.

  • Corrosion protection

    Hot-dip galvanizing or paint systems, selected per project environment — coastal salt exposure is specified differently from an inland site.

  • Wind loading

    Calculated for the location of the project under the applicable code. No default wind speed is applied to every building.

  • Detailing and export packing

    Tekla-based detailing with clash-free shop drawings, part numbering, planned container packing and a 3D installation guide.

04 / Projects & markets

Where the containers go

Project / Brazil

A 9,800 m² steel food factory building

Delivered in Brazil in 2024 — one of our recent export projects. Cold storage, food processing halls and food factory buildings are a regular part of our export work, and this one shows the scale we handle.

9,800 m²Building area
2024Delivered

Africa

  • Mozambique
  • South Africa
  • Nigeria
  • Kenya
  • Ghana
  • Tanzania
  • Angola
  • Zambia
  • Uganda

South America

  • Brazil
  • Argentina
  • Chile
  • Peru
  • Colombia
  • Paraguay

05 / Why work with me

What you actually get

  • You talk to an engineer, not a queue

    The person who specifies your building is the person who answers your messages.

  • Distance is designed out

    Clash-free detailing before fabrication, so problems are solved on paper rather than on your construction site.

  • Every part numbered, every container planned

    Parts are marked and packed in an assembly sequence, so unloading follows the same logic as erection.

  • A 3D guide for first-time builders

    If your team has never erected a steel building before, the guide shows the sequence step by step.

  • Specification matched to your climate

    Cladding, insulation and corrosion protection are chosen per project, not copied from a template.

  • Honest answers, including the uncomfortable ones

    If a cheaper design will not survive your conditions, you hear that before you order — not after.

06 / FAQ

Questions buyers ask me first

07 / Contact

Send me the site, or just describe the building

Tell me what the building will be used for, roughly how large it is, and where the site is. That is enough for a straight answer.